Intelli-Hood Madrid Hotel Retrofit Case Study


Author: Randy Miles – Dec 29, 2016

CONTEXT

Rated at 4-stars, the Hotel ILUNION Pio XII in Madrid, Spain sought to save energy in their kitchens. In 2014, they hired Melink to  install Intelli­-Hood® demand control kitchen ventilation as a means to  reach this goal. Here is more information regarding the hotel kitchens:

  • Total motor power: 6 HP
  • Daily operating hours: 14
  • Days per week: 7
  • Weeks per year: 52
  • Cost per kilowatt hour: 0.11 EURO


RESULTS

Intelli-Hood saved 8,072 EURO in utility costs and reported an average fan speed of 56%. This resulted in a 2.1 year payback and and reduced carbon emissions.  

Energy savings graphic

Below is a sample graph of the varying exhaust fan speed for one day at the hotel:

Graph

And the below graphic indicates the before (navy) and after (green) reductions in kilowatt hours, heat load, and exhaust volume:

Bar graph


Could Intelli-Hood be a fit for my project?

Are you curious how much energy Intelli-Hood could save within your commercial or industrial kitchens?  Submit an energy savings estimate request form at the bottom of our Intelli-Hood page to get started.


Email this case study or share it to your social media by clicking the icons below.
Author Photo

Authored By: Randy Miles

Randy Miles serves as the general manager of the Intelli-Hood® division at Melink Corporation.   Randy is responsible for the business operations and leading the global growth strategy for demand control kitchen ventilation.  He began his career with Melink Corporation in 2012 as the project manager for the West Region followed by leading business development efforts in the region and then across the business unit as the director of sales.