Overview
Performance
The installation of Intelli-Hood at Eurostars Torre Sevilla proved highly successful, with a simple payback period of 2.2 years, demonstrating rapid return on investment. Operating expenses were reduced by 60%, highlighting significant financial benefits and reinforcing the hotel’s financial sustainability. The optimized kitchen hoods maintained an average fan speed of 59%, minimizing energy waste. Additionally, the DCKV controls resulted in annual CO2 savings of 73,213 lbs, supporting the hotel’s commitment to environmental sustainability.
Conclusion
The installation of Intelli-Hood at Eurostars Torre Sevilla resulted in significant utility cost savings, reduced operating expenses, and improved environmental sustainability. The seamless integration and impressive performance demonstrate the effectiveness of Intelli-Hood in optimizing kitchen ventilation systems. Eurostars Torre Sevilla exemplifies the positive impact achievable with DCKV controls.
Download the full case study or contact us today to learn more about Intelli-Hood® and the benefit of kitchen hood controls.