Finishing Touches

The greenest building in the world finally starts to look green.” Fresh sod is laidwhile the rest of the property is seeded and strawed. Inside, painting is wrapping up and flooring is installed. The geothermal loop is flushed, and the heat pumps are ready to functionAuto-dimming lighting and ceiling “clouds” (large tiles to absorb noise in the open-concept office space) are installed.