Intelli-Hood Frankfurt Hotel Retrofit Case Study

Context

In October 2012 the Radison Blu Hotel in Frankfurt installed their first Melink Intelli-Hood system. Following the success of this project another 7 installations followed throughout Germany, Switzerland, Austria and Poland. Additional opportunities in the portfolio are being reviewed as a result of the energy savings being realized at the existing properties. There is an established and dedicated network throughout Europe to ensure project support from concept to completion for commercial kitchen operations.

Results

intellihood radison blu savings graphic

 

COULD INTELLI-HOOD BE A FIT FOR MY PROJECT?

Are you curious how much energy Intelli-Hood could save within your commercial or industrial kitchens?  Submit an energy savings estimate request form at the bottom of our Intelli-Hood page to get started.

EMAIL THIS CASE STUDY OR SHARE IT TO YOUR SOCIAL MEDIA BY CLICKING THE ICONS BELOW.

Intelli-Hood Barcelona Hotel Retrofit Case Study

CONTEXT

Intelli-Hood was installed in the NH Constanza by Savergy Solutions in Barcelona, Spain in December of 2015.

  • Total motor power: 3.75 HP
  • Daily operating hours: 12.5
  • Days per week: 7
  • Weeks per year: 52
  • Cost per kilowatt hour: 0.11 EURO

RESULTS

 

Energy savings graphic

Below is a sample graph of the varying exhaust fan speed for one day at the hotel:

Green graphic

And here are before (navy) and after (green) reduction results of kilowatt hours, heat load, and exhaust volume.

Bar graph

 

Could Intelli-Hood be a fit for my project?

Are you curious how much energy Intelli-Hood could save within your commercial or industrial kitchens?  Submit an energy savings estimate request form at the bottom of our Intelli-Hood page to get started.

 

Email this case study or share it to your social media by clicking the icons below.