Intelli-Hood Barcelona Hotel Retrofit Case Study


Author: Randy Miles – Feb 20, 2017

CONTEXT

Intelli-Hood was installed in the NH Constanza by Savergy Solutions in Barcelona, Spain in December of 2015. 

  • Total motor power: 3.75 HP
  • Daily operating hours: 12.5
  • Days per week: 7
  • Weeks per year: 52
  • Cost per kilowatt hour: 0.11 EURO


RESULTS


Energy savings graphic

Below is a sample graph of the varying exhaust fan speed for one day at the hotel:

Green graphic

And here are before (navy) and after (green) reduction results of kilowatt hours, heat load, and exhaust volume.

Bar graph


Could Intelli-Hood be a fit for my project?

Are you curious how much energy Intelli-Hood could save within your commercial or industrial kitchens?  Submit an energy savings estimate request form at the bottom of our Intelli-Hood page to get started.


Email this case study or share it to your social media by clicking the icons below.
Author Photo

Authored By: Randy Miles

Randy Miles serves as the general manager of the Intelli-Hood® division at Melink Corporation.   Randy is responsible for the business operations and leading the global growth strategy for demand control kitchen ventilation.  He began his career with Melink Corporation in 2012 as the project manager for the West Region followed by leading business development efforts in the region and then across the business unit as the director of sales.   

Most Recent Posts