Melink Solar & Geo Awarded U.S. Department of Energy Grant

FOR IMMEDIATE RELEASE

Why it Matters

Cincinnati, Ohio — Melink Solar & Geo, Inc., a solar PV and geothermal engineering company, has been awarded grant funding by the United States Department of Energy’s (DOE). The Office of Energy Efficiency and Renewable Energy (EERE) specifically provided the grant funding. The funding enables Melink to accelerate the research and development of its next-generation Hybrid Geothermal HVAC System. This system stores energy using thermal batteries. It can potentially reduce installation costs of geothermal heat pump systems. In effect, providing significant energy saving opportunities for the U.S. with widespread implementation. The system’s prototype currently heats and cools Melink’s new Net-Zero Energy HQ2 facility in Milford, Ohio.

Melink Hybrid Geothermal HVAC System
Melink Solar & Geo has been awarded an innovation grant from the U.S. Department of Energy for its Hybrid Geothermal HVAC System. A system prototype is in operation at its Milford, Ohio, headquarters.

“Our company is developing a Hybrid Geothermal HVAC System to minimize the need for expensive ground loops. Instead, we are mimicking the thermal energy storage capacity of the water inside such ground loops with phase change materials (PCM),” said Steve Melink, founder and CEO. “Melink is piloting the first prototype at our Net-Zero Energy headquarters, and we are now developing next-generation prototypes for eventual commercialization. With our third U.S. Department of Energy grant, we are committed to mainstreaming this technology for the benefit of the entire HVAC industry.”

Hard Work Pays Off

The funding is part of an ongoing innovation project with the DOE. The project encourages small businesses to advance innovation at federal agencies. Melink received the recent funding as a result of its Hybrid Geothermal HVAC System. This system demonstrated technical feasibility during the first phase of research. Melink Solar & Geo’s skill team worked collaboratively with the University of Dayton, Oak Ridge National Laboratory, and industry partners. Together, we designed a more cost-effective and energy efficient HVAC system.

“Funding from the DOE is the result of a multi-year effort. A group of intelligent and highly dedicated people have proven that the system has merit. I’m excited to say that the Hybrid Geothermal HVAC System is just one part of our growing platform of Net-Zero products,” said Seth Parker, vice president and general manager of Melink Solar & Geo.

The two-year funding will be used to finalize engineering and early commercialization of the Hybrid Geothermal HVAC System. For more information about the system or Melink Solar & Geo, please visit https://melinkcorp.com/geothermal or contact [email protected].

About Melink Solar & Geo

Melink Solar & Geo is a national provider of renewable energy and efficiency solutions for commercial buildings. We provide consulting services and turnkey management of solar and geothermal projects. These services help businesses of all sizes reduce energy consumption and produce clean and sustainable energy for their facilities. The company recently opened a Zero-Energy building on its campus, featuring new thermal storage technologies being tested. This will help further mainstream geothermal HVAC for commercial use. Melink Solar & Geo is affiliated with Melink Corporation, which provides energy efficiency solutions for commercial buildings.

Melink Solar Featured on 2020 Top Solar Contractors List

Solar Power World magazine’s Top Solar Contractors annual list includes Cincinnati-based solar installer.

FOR IMMEDIATE RELEASE

Cincinnati, Ohio — Although the COVID-19 pandemic is the immediate crisis, mitigating climate change is also an urgent issue. Solar installations are one way to help reduce greenhouse gases from fossil fuel-based power generation. Solar Power World has recognized the efforts of solar contractors across the United States in its 2020 Top Solar Contractors list, where local solar installer Melink Solar achieved a rank of 69 out of 407 companies.

Top Solar Contractors

The Top Solar Contractors list is developed each year by Solar Power World to honor the work of solar installers big and small. Solar firms in the utility, commercial and residential markets are ranked by number of kilowatts installed in the previous year. Companies are grouped and listed by specific service (developers, electrical subcontractors, EPCs, installation subcontractors, rooftop installers), markets and states.

“The Solar Power World team is so pleased to highlight more than 400 companies on the 2020 Top Solar Contractors list, especially during this unprecedented time,” said Kelsey Misbrener, senior editor of Solar Power World. “All contractors featured on the 2020 list reported strong 2019 installation numbers and are continuing to stand tall this year.”

This year’s collection of more than 400 Top Solar Contractors is facing obstacles that the industry has never seen before. The first quarter of 2020 was the country’s biggest ever capacity gain, with 3.6 GW of new solar capacity added. However, COVID-19 impacts slowed the market in Q2.

Melink Solar installed 27,266.8 kW (27.2 MW) of solar power in 2019. Since its founding, the company has installed more than 65 MW of solar, equivalent to 215,000 solar panels. Melink Solar is a commercial solar EPC (engineering, procurement and construction) firm offering turnkey solutions with projects across the U.S. The firm designs solar systems, procures all labor and supplies, constructs the solar array, monitors performance and provides remote and field troubleshooting assistance.

To learn more about Melink Solar, please visit www.melinkcorp.com/solar.

About Melink

Melink Corporation is a global provider of energy efficiency and renewable energy solutions for commercial buildings with five offerings: Intelli-Hood® Kitchen Ventilation Controls, HVAC Test & Balance, Solar PV, Geothermal HVAC, and PositiV® Building Health Monitor. For more than 30 years, Melink has helped companies save energy, increase profitability, and make the world more sustainable. In 2018, Melink became an ESOP and is now 100% employee-owned.

About Solar Power World

Solar Power World is the leading online and print resource for news and information regarding solar installation, development and technology. Since 2011, SPW has helped U.S. solar contractors — including installers, developers and EPCs in all markets — grow their businesses and do their jobs better.

Maintaining Perspective (For a Better Future)

Colleagues, Team Members, Friends, and “Family”:

Global pandemic.  Divisive rhetoric.  Recession.  Systemic racism.  Civil unrest.  Climate change.  On their own, each issue represents a monumental challenge for the United States of America — let alone the global community.  Yet, here we are, faced with the totality of these seemingly insurmountable problems. As with any challenge we are faced with, we have a choice to make: Lay down and surrender.  Or, stand-up and find a solution. But nothing can change without first changing our perspective.

Despite the perpetual drumbeat of bad news, we must be intentional and work hard to maintain perspective. For without it, we are subject to become victims of circumstance, insecurity, desperation, and anxiety. Reason yields to emotion. Our thoughts become overwhelmed and critical thinking, cloudy. Therefore, let us seek perspective.

  • Historical.  For nearly 250 years, America has persevered from one crisis through to the next:  war, depression, pandemic, natural disaster, gun violence, etc.  Has it ever been easy?  Certainly not.  The night is darkest just before the dawn.  Though it may be challenging to see, we will emerge stronger than ever before. 
  • The COVID-19 pandemic is a public health crisis.  In incredibly short order, we have made massive societal adjustments to manage the impacts.  The growth clip of the pandemic is slowing.  And there is a tremendous amount of investment, research, and development, with some of the best minds in the world, working to minimize and hopefully eradicate this disease. 
  • These are times of divisive rhetoric, a crisis of culture.  Fortunately, 2020 is an election year.  Soon we shall have a meaningful opportunity to exercise our vote and drive whatever change it is we want to see.  Debates on social media will only get us so far.  Elections matter.  Vote.
  • We are in a recession, an economic crisis.  Businesses are re-opening and people are getting back to work.  The impetus of this recession was an unpredictable, catastrophic event, not part of a normal cyclical downturn.  Our new normal may be different, but consumers will consume.  Things will get better.  
  • Systemic racism is, at its core, a crisis about the soul of our society.  We, along with many of you, are disturbed by the injustice that plagues our country.  Clearly, the national conversation has been elevated and this problem is being given the attention it so desperately needs and deserves.  In the spirit of seeking a better world, for ourselves, our children, and grandchildren, we pray that these events shall not go by in vain.  Rather, that as a nation we may fulfill the concept of ‘Equal Justice Under the Law.’ 
  • Prior to the pandemic, the cause, risks, impacts, and remedies of climate change were beginning to garner regular mainstream media attention.  This is a crisis in slow-motion that will hit public health, the economy, culture, society, and most certainly human rights.  The good news is not that the tide is turning – it has turned.  For the first time in 130 years, renewable energy production in the United States has surpassed coal.  And more electric cars are being sold than ever before.  We have a long, long way to go to stave off the worst impacts of climate change, but this is progress; net-zero energy is coming.  Through our continued innovation and deployment of energy efficient and renewable energy technologies and services we will continue transforming the world.

Still yet, you may remain daunted by the scale of these issues. If so, we offer the following actionable items, to put into perspective. First, as a reminder, maintain perspective and look for the good.  Do not be naïve, but staying positive requires choice, intention, and critical thinking. Second, carry your world on your shoulders, not the world. That is, to say, do not worry about things beyond your control. Someone once said worry is interest paid on trouble before it comes due. Your resources are limited. Focus them in areas where you have control and, or influence. Similarly cut out the noise. Seek truth when you absolutely need to be but be judicious in so doing. Apply yourself where and when it matters most. 

Finally, beyond their respective magnitude and impact, I believe each of these issues has one more critical attribute in common:  they are incredibly complex. We cannot solve them if we remain entrenched and endeavor for our perspective “side” to win.  We can and will continue solving complex issues if we remain open minded, empathetic, collaborative, and firmly commit to a better future. 

To our children, and grandchildren,

Craig M. Davis
President & Employee-Owner

Steve Melink
Chairman & CEO

Melink Completes Zero-Energy Building at Super-Green Campus

FOR IMMEDIATE RELEASE

CINCINNATI, OHIO — Melink Corporation has completed construction of HQ2, its second Zero-Energy Building headquarters, at its super-green business park in Milford, Ohio.

The Melink HQ2 is a Zero-Energy Building (ZEB), meaning that the total amount of energy used by the building on an annual basis is less than or equal to the amount of renewable energy generated on site. The cutting-edge project serves as a prototype ZEB for architects, engineers, and owners to help mainstream Zero-Energy best practices.

“Our goal is to show the world that new and existing buildings can be made Zero-Energy at a cost premium of less than 15%,” said Steve Melink, who founded Melink Corporation in 1987.  “The benefits are not only significant energy savings but a reduced carbon footprint and enlightened corporate brand that attracts and retains customers and employees.”     

To achieve Zero-Energy, also commonly referred to as “Net Zero,” HQ2 features several innovations, including a super-insulated envelope, super-geothermal heating/cooling system, an intelligent ventilation system, automatic lighting and shade controls, and a solar PV canopy in its parking lot with charging stations for electric vehicles (EVs).

https://youtu.be/mmnkvI9Gz_Y

Businesses, schools, and government agencies are invited to tour the Melink HQ2. Melink’s purpose is to educate and inspire other leaders who can further accelerate and capitalize on the shift to a clean energy economy. A grand opening celebration for HQ2 is being planned for late spring.

HQ2 is the second building on Melink’s campus. HQ1 was constructed in 2005 as a LEED Gold facility, and in the following years it was improved to Net-Zero Energy, Energy Star 99, and LEED Platinum. Also, Melink’s fleet of vehicles consists of all hybrid and EVs.

Melink Corporation is a global provider of energy efficiency and renewable energy solutions for commercial buildings with five offerings: Intelli-Hood® Kitchen Ventilation ControlsHVAC Test & BalanceSolar PV, Geothermal HVAC, and PositiV® Building Health Monitor. For more than 30 years, Melink has helped companies save energy, increase profitability, and make the world more sustainable. In 2018, Melink became an ESOP and is now 100% employee-owned.

Melink Develops 1.26MW Solar Arrays At University Of Dayton

FOR IMMEDIATE RELEASE

CINCINNATI, OHIO – Melink Corporation has announced a partnership with the University of Dayton to install 4,026 solar panels with a capacity of 1.26 megawatts of power at two of the University’s campus locations; Curran Place and Fitz Hall. Melink Corporation will engineer and construct the arrays, as well as own them and sell the electricity to the University as part of a long-term power purchase agreement.  The University has an option to purchase the arrays after eight years.

The solar arrays will provide nearly 10 percent of the power consumption of both buildings as well as power electric car stations at the two locations. Overall, the panels will provide approximately 2 percent of the campuswide power consumption and offset carbon emissions by about 1 percent annually. Offsetting campus carbon emissions by 1 percent in a year is equal to the annual greenhouse gas emissions of 278 cars or the annual carbon dioxide emissions from 1.4 million pounds of burned coal, 140 homes, or conserving 3,010 barrels of oil.

 “We are super-excited to partner with the University of Dayton, said Melink CEO Steve Melink.  “This is an opportunity to educate and inspire not only the students and faculty but the public
throughout Ohio and the Midwest.  Sustainability and clean energy are the way of the future, and U.D. has just put a big stake in the ground as a leader.”  

 

Melink Corporation and the University of Dayton will work together to provide opportunities for students, faculty, and researchers to participate in the installation of
the modules, and document the process for future use. Post installation, the Hanley Sustainability Institute and the University of Dayton Engineers in Technical Humanitarian Opportunities of Service learning (ETHOS), among other faculty, staff and students,  plan to use the modules for sustainability research and/or incorporate them into the curriculum or other programming.

“One attractive feature of working with Melink is that Melink involves our students in this project from the very beginning and on an ongoing basis,” said Bob Brecha, director of research in the University of Dayton Hanley Sustainability Institute. “Our campus has quite intentionally become a giant sustainability lab where students from all majors can have a hand in many of our efforts to become a greener campus.”

Learn about how solar could benefit your school or business at melinkcorp.com.

About Melink Corporation: We are a global provider of energy efficiency and renewable energy solutions for the commercial building industry. With four business units and a singular energy mission, we help companies save energy, increase profits and make the world a more sustainable place.

Melink launches geothermal HVAC division to meet growing demand

For Immediate Release

CINCINNATI
– April 6, 2017 – Data indicates a growing demand for geothermal heating and cooling technology, and Melink Corporation responded by starting a new Melink Geo business unit.

Geothermal heating, ventilation and air conditioning (HVAC) offers building owners a more energy-efficient and environmentally friendly solution than conventional systems. Structures using geothermal HVAC typically save between 25 and 50 percent on HVAC costs, reduce their maintenance costs and water usage, and extend the life of the building’s equipment.

Additionally, as part of Melink Geo, its team of innovators have developed a patented pre-engineered geothermal pump station. The Manifest™ eliminates the need to engineer a custom pump station for each individual geothermal HVAC project, thus making geothermal more affordable and efficient.

“With 30 years of experience in the HVAC industry, providing geothermal solutions for building owners is a logical next step for Melink,” said Steve Melink, founder and CEO. “We provide turnkey management of geothermal projects for architects, engineers, ESCOs and building owners. In this capacity, we also serve as a consulting engineer for architects and engineering firms across the nation.”

A report by Transparency Market Research stated, “the global geothermal heat pumps market is forecast to reach $130.5 billion by the end of 2020, exhibiting a 13.1 percent compound annual growth rate from 2014 to 2020.”

And a survey conducted by Consulting-Specifying Engineer showed that geothermal ranks in the top five of technology demands for office building projects. According to the survey, 42 percent of engineers expect to see increasing use of geothermal HVAC for office building projects.

What is geothermal HVAC?

Geothermal is a proven, reliable and efficient technology. The U.S. Environmental Protection Agency states that a geothermal HVAC system is the most energy efficient way to heat and cool a building.

Geothermal heat pumps use the ground as a heat exchanger via a closed­-loop water circuit. During the cold winter months, the geothermal HVAC system takes heat out of the ground and transfers it into the building. And during the hot months of summer, the system removes heat from the building and transfers it back into the ground.

Since the ground maintains a constant temperature of 55­­-70°F depending on location, a geothermal HVAC system can result in considerable HVAC savings for a building owner, compared to conventional systems using air­ source condensing units for cooling and fossil fuels for heating.

To learn more or to schedule an interview with Steve Melink, please contact Marketing Manager Allison Sternad at 513.965.7300 or [email protected].

Melink Launches Financing for Intelli-Hood® Kitchen Ventilation Controls

FOR IMMEDIATE RELEASE

CINCINNATI – Dec 30, 2016 – Melink Corporation is offering an innovative new program, Melink Finance, to help provide financial options for customers seeking to implement energy-saving projects without large up-front capital commitments. The goal of the program is to allow customers to purchase Melink’s Intelli-Hood® kitchen ventilation controls and use energy savings to pay for the equipment cost on a monthly basis. 

The Melink Finance program can be tailored to meet customers’ cash flow needs based on their particular individual situations. For instance, there are deferred payment options and seasonal payment structures to match the customer’s revenue stream if the company’s existing budget is depleted. The program seeks to shift the cost of energy saving projects from large capital expenditure allocations to the operating expense side of the ledger. This shift will allow customers to have more flexibility in project timing and capture available utility incentives before they expire. 

“Our mission is to save as much energy as possible for our customers, and this program allows us to remove financial barriers in support of our customers energy savings goals,” said Randy Miles, vice president and general manager of Intelli-Hood. “This allows them to take advantage of operational cost savings on day one and provide an immediate ROI. Essentially, we can create a net positive cash flow transaction on the first day by having the energy savings exceed the monthly payment for the controls. This will allow our customers to achieve their profitability and sustainability goals while preserving capital expense.”

For more information on Melink Finance, please contact
Luci Feie at 513-965-7300 or [email protected] 

About Melink Intelli-Hood

Melink Corporation is the pioneer in demand control kitchen ventilation controls, having  launched Intelli-Hood in 1990. Melink’s patented Intelli­-Hood HVAC controls package visually monitors the level of cooking activity and automatically instructs the exhaust fan to operate only as fast as necessary. Intelli­-Hood is installed into new or existing commercial hood systems and transforms a
basic stainless steel box into an intelligent energy­-saving machine.
Melink has installed Intelli-Hood controls on more than 30,000 kitchen hoods around the world. Additional information and resources may be found at www.intellihood.comIntelli-Hood is one of four business offerings from Melink, a global provider of energy efficiency and renewable energy solutions for the commercial building industry. The others are HVAC Testing & Balancing, Solar PV Development and Geothermal HVAC. For 30 years, the Cincinnati-based company has been helping organizations save energy, increase profits and make the world a more sustainable place. Melink’s corporate headquarters is LEED Platinum andNet-Zero Energy, and its vehicle fleet consists of all hybrid and electric
cars. To learn more about Melink Corporation, visit 
Melinkcorp.com or call 513.592.3391.

Melink develops vast solar farm for NC country club

For Immediate Release

CINCINNATI – Dec. 1, 2016 – Melink Corporation has completed development of a 5.25 megawatt solar farm in the Charlotte, North Carolina, metro region.

Located on land owned by Rock Barn Country Club & Spa in Conover, the photovoltaic array began operating Nov. 18. The vast array comprises 16,948 solar panels on 28 acres.

All of the electricity produced by the solar farm will be sold to Duke Energy. The system is expected to generate more than 7.3 million kilowatt hours of clean energy – enough electricity to serve 500 homes annually – in its first year of operation. The system has an expected life of up to 35 years.

“We are very grateful for the opportunity to have partnered with Rock Barn’s owner, Don Beaver, on this project,” said Steve Melink, founder and CEO of the Cincinnati-based company that provides energy efficiency and renewable energy solutions for the commercial building industry. “At 5 megawatts, it is our largest solar PV project to date. And being located in North Carolina, it allows us to show our national capabilities. Solar power is the way of the future and we are proud to be helping lead the way.”

Bill Parrish, vice president of Rock Barn Properties, added, “We explored development opportunities on some of our land that was otherwise unbuildable for commercial or residential, and identified this project as a good economic return and an environmentally friendly investment. Through our subsequent due diligence process, we identified Melink Corporation as an outstanding partner for our solar project.”

Rock Barn Properties is the owner/operator of Rock Barn Country Club & Spa, which includes two signature championship golf courses, 485 residences and an equestrian center.

Construction of the solar farm began in November 2015 and concluded in June, despite record precipitation in the Blue Ridge Mountain region of North Carolina in November and December. The solar farm has just received final regulatory approval to begin operations.

To learn more about the solar project and see the array from an aerial viewpoint, click here. You may learn more about the country club at Rock Barn Properties.

To schedule an interview with Steve Melink, please contact Marketing Manager Luci Feie at 513.965.7300 or [email protected].

ABOUT MELINK

Melink Corporation is a global provider of energy efficiency and renewable energy solutions for the commercial building industry, with four business offerings: HVAC Testing & Balancing, Intelli-Hood® Kitchen Ventilation Controls, Solar PV Development and Geothermal HVAC. For 30 years, the Cincinnati-based company has been helping organizations save energy, increase profits and make the world a more sustainable place. Melink’s corporate headquarters is LEED Platinum and Net-Zero Energy, and its vehicle fleet consists of all hybrid and electric cars. To learn more about Melink Corporation, visit Melinkcorp.com or call 513.965.7300.

EPA Recognizes Melink Intelli-Hood® with 2015 ENERGY STAR® Emerging Technology Award

FOR IMMEDIATE RELEASE

EPA Recognizes Melink Intelli-Hood® with 2015 ENERGY STAR® Emerging Technology Award

Cincinnati, OH- January 30, 2015- The U.S. Environmental Protection Agency (EPA) has recognized Melink Corporation’s Intelli-Hood® Demand Control Kitchen Ventilation (DCKV) System with the 2015 ENERGY STAR Emerging Technology Award for its ability to significantly reduce greenhouse gas emissions. Intelli-Hood®’s accomplishments will be publically recognized at The North American Association of Food Equipment Manufacturers (NAFEM) Show in Anaheim, CA on February 19-21, 2015.

This accomplishment marks another milestone for Intelli-Hood® since pioneering DCKV technology in 1989. After overcoming regulatory obstacles and winning the 2012 AHR Product of the Year, this award further propels the market acceptance of DCKV and its aim to further green the commercial kitchen. With over 10,000 systems installed worldwide and an estimated 650 million kWh/year saved, Intelli-Hood® contributes to energy conservation goals of the top commercial food service operations.

EPA ENERGY STAR Program Manager, Una Song, responded, “We extend  congratulations and applause to Melink Intelli-Hood® for the Emerging Technology Award accomplishment.  The Intelli Hood® System is a benchmark for DCKV technology that offers energy savings with financial value.”

Craig Davis, Vice President of Intelli-Hood®, commented on receiving the award, “Melink Corporation is fully committed to sustainability, and we are focused on the development of energy efficient products and services that support this commitment.  Not only are we honored to be recognized by the EPA for our Intelli-Hood® technology, we also applaud the EPA’s effort to bringing DCKV technology, such as Intelli-Hood®, to the forefront of energy efficiency”.

Steve Melink, President of the Melink Corporation, states the following as a response, “We are very grateful for this award.  As the pioneer of automatic variable-speed controls for commercial kitchen hoods over 25 years ago, this further validates our vision and passion for innovation.”

Technology Overview

Commercial kitchen ventilation removes the heat and effluent generated by the cooking process from the kitchen space, ensuring the comfort and safety of the cooking staff.  Commercial kitchen ventilation is typically composed of an exhaust hood suspended above the cooking appliances ducted to fans necessary to expel the heat and effluent outside.  To replace the air lost through this process, make-up air (MUA) must be provided by the building’s HVAC system or a dedicated MUA fan to the kitchen, which is composed of its own fan, ducts and potentially heating or cooling depending on the climate.

DCKV provides control over the ventilation system by modulating the speed depending on cooking activity.  Traditionally, commercial kitchen ventilation systems would operate at their maximum designed speed/volume throughout the duration of the kitchen’s operating hours.  In contrast, DCKV provides automatic, continuous control over fan speed in response to temperature or optical sensors that monitor cooking activity.

About Melink Corporation

Melink Corporation is a pioneer in energy efficiency and renewable energy solutions for commercial and institutional facilities. The Cincinnati-based company has become an industry leader comprised of three businesses: Melink Test & Balance provides heating, ventilation and air conditioning commissioning services; Intelli-Hood® applies energy-saving controls to commercial kitchen ventilation systems; and Melink Solar supplies solar photovoltaic project development services for commercial building owners and utilities. Melink works with some of the largest and most successful organizations in the world, including Walmart, Apple, Google, Microsoft, Procter & Gamble, Verizon Communications, U.S. military, Target, Whole Foods Market, Hilton Hotels & Resorts, Honeywell, Siemens AG, PNC Financial Services Group, Inc. and Massachusetts Institute of Technology. In addition, Melink operates in a LEED Platinum and Net Zero Energy office building, making it the greenest building in Ohio. For more information, please visit melinkcorp.com

About ENERGY STAR

ENERGY STAR® is the simple choice for energy efficiency. For more than 20 years, people across America have looked to EPA’s ENERGY STAR program for guidance on saving energy,
saving money, and protecting the environment. Behind each blue label is a product, building, or home that is independently certified to use less energy and cause fewer of the emissions that contribute to climate change. Join the millions already making a difference at energystar.gov.

Contact:

Lucinda Carl

Melink Corporation

Marketing and Sales Specialist

T: 513.965.7300

E: [email protected]